“Slow and Steady Doesn’t Always Win the Race” – Applicability of a Statute of Repose on Indemnity/Contribution Claims in New Hampshire

Two track runners crossing finish line

Attorney Rahul Gogineni discusses Rankin v. South Street Downtown Holdings, Inc.

November 24, 2019
Rahul Gogineni - The Subrogation Strategist

In Rankin v. South Street Downtown Holdings, Inc., 2019 N.H. LEXIS 165, the Supreme Court of New Hampshire considered, pursuant to a question transferred by the trial court, whether RSA 508:4-b, the statute of repose for improvements to real property, applies to indemnity and contribution claims. The court concluded that based upon the plain reading of the statute, it applies to indemnity and contribution claims. As noted by the court, a holding to the contrary would violate the intent of a statute of repose, which is to establish a time limit for when a party is exposed to liability.

In Rankin, after falling and injuring himself while leaving a building, John Rankin and his wife brought an action against the property owner, South Street Downtown Holding, Inc. (South Street) in 2017. South Street subsequently filed a third-party complaint against multiple parties including an architectural company, Wagner Hodgson, Inc. (Wagner), who was involved in a renovation project at the property. The project was substantially complete in 2009. Wagner responded by moving to dismiss the action, arguing that South Street’s indemnification and contribution claims were barred by the applicable statute of repose.

RSA 508:4-b specifically states,

Except as otherwise provided in this section, all actions to recover damages for injury to property, injury to the person, wrongful death or economic loss arising out of any deficiency in the creation of an improvement to real property, including without limitation the design, labor, materials, engineering, planning, surveying, construction, observation, supervision or inspection of that improvement, shall be brought within 8 years from the date of substantial completion of the improvement, and not thereafter. (Emphasis added).

Mr. Gogineni may be contacted at goginenir@whiteandwilliams.com



714.701.9180

Arrange No Cost Consultation










Subscribe to Construction Defect Journal

Construction Defect Journal Archives - Recent CD News for Construction Claims Professionals

 

Construction Defect Journal is aggregated from a variety of news sources, article submissions, contributors, and information from industry professionals.

No content on this site should be construed as legal advice or expert opinion. By viewing this site you agree to be bound by its terms and conditions

 

Copyright 2019 - Construction Defect Journal – All Rights Reserved