April 13, 2017
—
JT Long - Engineering News-Record
In a race to fix the damaged Oroville Dam’s main spillway by November, the California Dept. of Water Resources, the operator of the country’s tallest dam, is going to bid with a 65%-complete design that breaks recovery efforts into three parts, with an ultimate goal of doubling the main spillway’s release capacity to 270,000 cu ft per second.
ENR may be contacted at ENR.com@bnpmedia.com